How do I install SpeedyPro?

Summary

Your SpeedyPro will normally be installed by an experienced installer. The standard installation process usually takes 2 hours.

Assess Your Electrical System

Before you begin the installation, it’s important to evaluate your home’s electrical system to ensure it can support the power requirements of your new wall box.

  • Electrical Capacity: Check your home’s electrical panel to confirm it can handle the additional load. Most wallboxes require a dedicated circuit; you may need a circuit breaker with appropriate amperage.
  • Wiring Requirements: Ensure that the wiring is suitable for the power rating of your wall box. This may involve upgrading existing wiring or installing new circuits.

Tip: It is recommended to consult a licensed electrician to verify that your electrical system meets the requirements for wall box installation.

What will be installed?

Below is information on the SpeedyPro you need to install:
home ev charging station product diagram

Size Color Cable Length Enclosure Rating
355mmx225mmx125mm【H*W*D】 Black and Silver 5M or Customizable IP54
Learn more about SpeedyPro.

How long does the installation process take?

Each installation process is unique, but standard installations take approximately 2 hours on average. If it is impossible to complete on the same day due to any unforeseen additional work, we will reschedule the installation date for a mutually convenient time.
Extra quotes:

  • If your installation environment does not meet the criteria for a standard installation, we can usually still carry out the installation but may incur additional charges.
  • Suppose the installation environment does not meet this product’s installation criteria. In that case, we will conduct a free site survey and provide a no-obligation quote for the additional work.
  • If the additional work is minimal and fits in with your installer’s schedule for the day, we may be able to collect payment from you and complete it on the spot.
  • If there is significant additional work, we will give you a quote, and if you accept, we will re-arrange for a professional to carry out the installation.
  • If you decide not to proceed, we will give you a full refund of all monies you have paid for the installation.

What do I need to prepare for the installation?

  • Drill and Drill Bits: These are used to make holes in the wall or mounting surface.
  • Screwdriver: For securing the SpeedyPro in place.
  • Level: To ensure the SpeedyPro is installed straight.
  • Wire Strippers and Connectors: For electrical connections.
  • Wallbox Installation Kit: This typically includes mounting brackets, screws, and other necessary hardware.

Safety Note: Always turn off the power at the circuit breaker before starting any electrical work to prevent accidents.

Last Updated on October 18, 2024 by yundic